H&R Block Garage

Parking Garage Concrete Protection

In this project, we installed a clear water repellent to reduce the recurrence of future staining and prevent corrosion of structural elements within the concrete. The loading dock and entry ramp were treated with Tremco’s Extreme Wear System, requiring multiple steps of various materials, but has a much faster rate of cure than other coatings. This project was completed on time and under budget.