The Chanute High School Project was a large sq. ft. project consisting of student classrooms, two gymnasiums, full theatrical auditorium, locker rooms, and library. The project also included a solid grouted and specially engineered steel FEMA shelter. The project was of CMU construction with 4 inch split faced veneer. The MCR Masonry portion of this project was completed in 18 months.
General Contractor: DJ McClenny, Project Manager Crossland Construction Co., Inc. 833 SE Avenue Columbus, KS 66725 |
|